The cold room was dismantled in Harrow, London and then transported to Birmingham for re-assembly, with added cold room space, which included two doors, one sliding door and hinge door.
Standard Clear PVC 2mm made to measure cold room curtains with stainless stell rail and standard sliding door mechanism with wide door for standard non EC palletes.