The cold room was dismantled in Harrow, London and then transported to Birmingham for re-assembly, with added cold room space, which included two doors, one sliding door and hinge door.
Designed, supplied and installed high hygiene level preperation areas. The covered flooring and channel edging allows for jet washing of walls with the purpose of eliminatinig bacteria build ups.